A$600,000 Base Quote for a 45-Square Home: Will the Final Bill Stay Near A$800,000?

APOA Editorial Team Published
New houses under construction in a Melbourne suburb, illustration for home building quotations and costs
Illustrative photograph: Troy Mortier / Unsplash (Clyde North VIC), used under the Unsplash License. Not a photo of the builder or project discussed.
In this article
  1. 1. Start with the definition of ’45 squares’
  2. 2. Display homes and base specifications can be very different
  3. 3. Site works and allowance items can change the total
  4. 4. Who appoints the building surveyor?
  5. 5. Builder insolvency and the new Home Warranty regime
  6. 6. Disputes do not necessarily begin in court
  7. 7. Compare quotes using one checklist
  8. APOA’s perspective
  9. Official guidance

APOA Community Insights | 21 November 2026 | Victoria | Drawn from an APOA homeowner group discussion on 20 November

What does a new home really cost after the display-home shine wears off? In an APOA discussion, a homeowner considering a 45-square house mentioned an indicative A$600,000 base build quote, plus A$100,000 for site and footing-related work and A$100,000 reserved for upgrades.

Some participants called it attractive; others worried about inclusions, site conditions and the cost of upgrading a basic specification. Experienced owners also shared stories of builders entering insolvency. These are individual accounts, not evidence about the current financial condition of any named builder.

Important: The figures below are an unverified participant account and preliminary budget, not a validated current offer from a particular builder or a general price benchmark.

1. Start with the definition of ’45 squares’

One Australian building square equals approximately 9.29 m². Forty-five squares are therefore approximately 418 m². The quoted area may include a garage, porch, alfresco and other spaces as well as living area. Confirm the architect’s plans and the calculation method before comparing a price per square metre.

Indicative itemAmount
Base construction quoteA$600,000
Site works / footing allowanceA$100,000
Upgrade allowanceA$100,000
Early indicative totalA$800,000

A$800,000 divided by 418 m² is around A$1,914/m², but this alone does not establish whether the offer is cheap or expensive. Compare the actual plans, specifications, land conditions, exclusions and contract terms; this is not a verified fixed all-inclusive contract price.

2. Display homes and base specifications can be very different

An experienced owner in the discussion listed ceiling heights, roof materials, insulation, floors, stairs, wall tiling, shower screens, appliances, cabinetry, benchtops, doors and fittings as common upgrades. Another reported spending around A$250,000 in upgrades on an earlier build.

No two buyers need the same upgrades. Distinguish comfort and energy performance (insulation, glazing and layout), personal preferences (tiles, benchtops and finishes) and mandatory compliance (safety, structure and energy standards). More upgrades do not automatically produce matching resale value.

3. Site works and allowance items can change the total

Sloping blocks, unexpected soil conditions, excavation, drainage, retaining walls, access, connections and external works all have cost implications. A quoted site allowance is not necessarily a cap. Request soil and engineering information before signing wherever practicable.

Pay attention to Prime Cost (PC) items (allowances for items such as fixtures or appliances not yet selected) and Provisional Sums (PS) (estimated cost of work not fully determinable at signing, sometimes excavation). Underestimated allowances can increase the final contract sum. Ask each builder for the detailed specifications and a list of excluded works.

4. Who appoints the building surveyor?

A participant asked whether the builder could appoint the Building Surveyor if its fee was included in the quotation. In Victoria, for domestic building work under a domestic building contract, the builder cannot appoint the private building surveyor. The owner or a suitably authorised agent makes the appointment. A builder can recommend a professional, but the legal appointment is a separate matter from how the fee is priced.

The surveyor’s statutory inspections and permits are also different from independent quality inspections a homeowner may commission at key stages. Check who is appointed, who pays, and whether choosing another surveyor causes duplication.

5. Builder insolvency and the new Home Warranty regime

One owner said their house was handed over in March 2023, and their builder entered insolvency shortly afterwards. This experience illustrates why the cheapest quote is not the only risk to assess.

Victoria’s Home Warranty scheme began on 1 July 2026, generally covering eligible new domestic building work under eligible contracts signed from that date and valued over A$20,000. In qualifying circumstances, it may provide help for incomplete, defective or non-compliant work if the builder fails or refuses to meet their obligations. The total assistance cap is A$400,000 per home, subject to eligibility, sublimits and exclusions.

For work covered under the older Domestic Building Insurance (DBI) arrangements, such as pre-July 2026 contracts with DBI certificates, the previous policy continues and does not automatically transfer to Home Warranty. Check contract dates and proof of cover carefully.

6. Disputes do not necessarily begin in court

The Building and Plumbing Commission (BPC) offers a free domestic building dispute resolution service, previously called DBDRV. In general, document the issue and attempt to resolve it with the builder first. Depending on the issue, BPC conciliation or other processes may follow, with VCAT an option for eligible unresolved disputes. Regulatory complaints, contract disputes and compensation claims are not necessarily the same route.

7. Compare quotes using one checklist

  • The same floor plan, area definitions and base specifications.
  • Soil tests, footing/slab design, drainage, access, retaining walls and service connections.
  • Prime Cost and Provisional Sum allowances, upgrade price lists, variation charges and exclusions.
  • Planning/building permits, surveyor appointment, independent inspections and council-related works.
  • Builder registration, Home Warranty or DBI documentation, progress payments, completion milestones and defects periods.
  • A realistic contingency allowance separate from estimated site works and upgrades.

APOA’s perspective

The cheapest base quote is not always the cheapest completed home. A sound decision means knowing exactly what you have been quoted, who carries each risk, and how much cash you need if assumptions change.

For another recent community discussion, see our granny-flat construction costs and rental returns article.

Official guidance

Editorial note: Figures and individual builder experiences are unverified community recollections. They do not establish current market prices, warranty entitlements or a finding about any company. General education, not individual building, legal or financial advice.